The installation of the front LH lower ball joint assembly requires nut tightening to 123 Nm (1,250 kgf-cm, 91 ft-lbf) followed by new cotter pin installation using proper alignment of holes or additional nut tightness up to 60 degrees. Begin by putting on the front axle assembly LH whereas subsequent steps include placement of the front suspension arm sub-assembly lower No.1 LH and then the tie rod assembly LH. Install the front disc followed by the front disc
Brake Caliper assembly LH then
Speed Sensor front LH. Fasten the front
Axle Shaft LH nut followed by the front wheel before executing a torque of 103 Nm (1,050 kgf-cm, 76 ft-lbf) when tightening. Examine front wheel alignment while checking ABS speed sensor signals but refer to the specific ABS inspection and testing methods for vehicles without VSC and use the procedures for the Vehicle Stability Control System for vehicles with VSC.