My Garage
Cart

OEM 2008 Toyota Sequoia Spark Plug

Ignition Spark Plug
  • Select Vehicle by Model
  • Select Vehicle by VIN
Select Vehicle by Model
Make
Model
Year
or
Select Vehicle by VIN
For the most accurate results, select vehicle by your VIN (Vehicle Identification Number).

1 Spark Plug found

  • 2008 Toyota Sequoia Spark Plug Diagram - 90919-01191
    View related parts

    2008 Toyota Sequoia Plug, Spark

    Part Number: 90919-01191
    $11.10 MSRP: $15.46
    You Save: $4.36 (29%)
    Ships in 1-3 Business Days
    ADD TO CART
    Product Specifications
    • Other Name: Spark Plug
    • Replaces: 90919-A1002
    • Part Name Code: 19100P
    • Item Weight: 0.50 Pounds
    • Item Dimensions: 3.9 x 1.1 x 1.0 inches
    • Condition: New
    • Fitment Type: Direct Replacement
    • SKU: 90919-01191
    • Warranty: This genuine part is guaranteed by Toyota's factory warranty.
    More Info
    Fits the following 2008 Toyota Sequoia Submodels:
    • Limited, Nightshade, Platinum, SR5, TRD Pro, TRD Sport | 8 Cyl 5.7 L FLEX, 8 Cyl 5.7 L GAS

2008 Toyota Sequoia Spark Plug

Looking for affordable OEM 2008 Toyota Sequoia Spark Plug? Explore our comprehensive catalogue of genuine 2008 Toyota Sequoia Spark Plug. All our parts are covered by the manufacturer's warranty. Plus, our straightforward return policy and speedy delivery service ensure an unparalleled shopping experience. We look forward to your visit!

2008 Toyota Sequoia Spark Plug Parts Q&A

  • Q: How to install the spark plugs and related components on 2008 Toyota Sequoia?
    A: A 16 mm plug wrench should be used to bolt in the 8 spark plugs for the 2UZ-FE engine with a torque of 18 Nm (178 kgf-cm, 13 ft-lbf). Position the 8 ignition coil assemblies with the help of 8 bolts which need to be torqued to 7.5 Nm (76 kgf-cm, 66 in-lbf). Afterward, connect the 8 ignition coil assembly connectors. Next install the Bank 2 air switching valve assembly before attaching both the Bank 2 air tube and No. 2 air injection system hose. Proceed to connect the No. 1 water by-pass pipe before installing the front fender apron seal right-hand side. The technical sequences includes installing the air switching valve assembly for Bank 1 and the No. 3 air tube and the No. 2 air hose then putting on the front fender apron seal LH. To finish the installation place the throttle body cover assembly together with the air cleaner hose assembly.