Q: How to install the hood cable assembly and related components on Scion xD?
A: The installation of the hood lock control cable assembly requires feeding it through the engine compartment before connecting the clamps based on illustrations. The hood lock control lever sub-assembly needs installation before hooking up the hood cable. You should apply MP grease to the hood lock sliding areas before connecting the hood cable and using 3 bolts torqued at 7.5 Nm (76 kgf-cm, 66 in-lbf). Review the hood sub-assembly and make required adjustments before concluding the inspection process. Use 9 clips and 6 screws and three new grommets for the installation of the front fender liner LH. To complete this task position the final components by putting on the side mudguard and the rocker panel moulding cover before setting the front wheel.
Q: How to install the hood cable assembly and related components on Scion xB?
A: Before installation of the hood cable assembly you must feed it into the engine compartment through the upper radiator support before attaching clamps according to illustrations. To proceed with installation secure the hood lock control lever sub-assembly while establishing a connection with the hood cable. The hood lock assembly requires application of MP grease to sliding segments before receiving the hood cable for bolt installation with 7.5 Nm (76 kgf-cm, 66 in-lbf) torque value. Perform needed adjustments to the hood sub-assembly during inspection. Two bolts should be installed into the water hose clamp bracket before tightening them to 5.0 Nm (51 kgf-cm, 44 in-lbf). The radiator cover requires 5 clips for installation. Install the LH front fender liner by fitment of 3 new grommets, 8 clips and 4 screws and the pin hold clip. Begin by placing the front side mudguard LH through its new grommet then fasten it with 2 screws followed by attaching the front wheel opening extension pad LH through 2 screws before secure the front wheel.