Q: How to install the antenna cable and related components on 2010 Scion xD?
A: A proper antenna cable installation begins with clamping the antenna cord sub-assembly sections using red tape on two locations of the side rail spacer where they match the roof headlining marking. Fasten the section using pink tape to the side rail spacer at one place where it matches the roof headlining marking before securing with tape at two points. The antenna cord should be fitted through the roof headlining slit before the tape is applied to three marked points. Install five clamps for the No. 2 antenna cord sub-assembly before connecting the connector and installing a bolt with 7.0 Nm torque (71 kgf-cm) or (62 in-lbf). Proceed to install the roof headlining assembly, rear shoulder belt anchor cover, seat belt anchor cover, rear center seat outer belt assembly, upper instrument panel sub-assembly, combination meter assembly, instrument cluster finish panel sub-assembly, glove compartment door assembly, instrument cluster finish center panel sub-assembly, map light assembly, room light assembly, visor holders (RH and LH), visor assemblies (RH and LH), assist grip, front pillar garnishes (RH and LH), center pillar upper garnishes (RH and LH), center pillar lower garnishes (RH and LH), front seat outer belt assemblies (RH and LH), seat belt anchor cover cap, roof side inner garnish assemblies (RH and LH), deck trim side panel assemblies (RH and LH), rear seat outer belt assemblies (RH and LH), luggage hold belt striker assembly, rear deck trim cover, rear door opening trim Weather Strips (RH and LH), rear door scuff plates (RH and LH), front door opening trim Weather Strips (RH and LH), cowl side trim boards (RH and LH), No. 1 and No. 2 instrument panel under cover sub-assemblies, front door scuff plates (RH and LH), rear seat assemblies (RH and LH), No. 1 rear seat leg covers (RH and LH), No. 2 rear seat leg cover (LH), and deck board assembly. Connect the cable to the negative battery terminal then tighten it to 5.4 Nm (55 kgf-cm, 48 in-lbf) while checking the SRS warning light for activation.