My Garage
Cart

OEM 2009 Scion xD PCV Valve

Position Crank Ventilation Valve
  • Select Vehicle by Model
  • Select Vehicle by VIN
Select Vehicle by Model
Make
Model
Year
or
Select Vehicle by VIN
For the most accurate results, select vehicle by your VIN (Vehicle Identification Number).

1 PCV Valve found

  • 2009 Scion xD PCV Valve Diagram - 12204-37010
    View related parts

    2009 Scion xD PCV Valve

    Part Number: 12204-37010
    $6.08 MSRP: $8.46
    You Save: $2.38 (29%)
    Ships in 1-3 Business Days
    ADD TO CART
    Product Specifications
    • Other Name: Valve Sub-Assembly, Vent; Engine Crankcase Vent Valve; Crankcase Vent Valve; Vent Valve; Valve Sub-Assembly, Ventilation
    • Part Name Code: 12204
    • Item Weight: 0.50 Pounds
    • Item Dimensions: 2.2 x 1.1 x 0.9 inches
    • Condition: New
    • Fitment Type: Direct Replacement
    • SKU: 12204-37010
    • Warranty: This genuine part is guaranteed by Toyota's factory warranty.
    More Info
    Fits the following 2009 Scion xD Submodels:
    • Base | 4 Cyl 1.8 L GAS

2009 Scion xD PCV Valve

Looking for affordable OEM 2009 Scion xD PCV Valve? Explore our comprehensive catalogue of genuine 2009 Scion xD PCV Valve. All our parts are covered by the manufacturer's warranty. Plus, our straightforward return policy and speedy delivery service ensure an unparalleled shopping experience. We look forward to your visit!

2009 Scion xD PCV Valve Parts Q&A

  • Q: How to remove the PCV Valve on 2009 Scion xD?
    A: Starting the replacement of the Positive Crankcase Ventilation Valve requires initial discharging of fuel system pressure. Start by removing the negative battery cable before taking off both engine under covers from their left and right sides. The first step should be draining engine coolant followed by removing the No. 2 cylinder head cover. Remove the hose with air cleaner cap sub-assembly before separating engine wire harness and disconnecting its bracket. Remove the No. 1 fuel vapor feed hose followed by the No. 1 vacuum transmitting hose along with the vacuum hose from its servicing position. First separate the fuel pipe clamp before disconnecting the fuel tube sub-assembly to remove the fuel delivery pipe sub-assembly together with the No. 1 delivery pipe spacer and the injector vibration insulator. First disconnect the starter assembly then remove the oil cooler tube when working on Automatic Transaxle transmission models while you also take off the transmission oil level gauge sub-assembly for Automatic Transaxle installations. The first steps for engine disassembly involve removing the engine oil level dipstick followed by the intake manifold and the ventilation valve sub-assembly through ventilation hose detachment and removal of the complete sub-assembly.