Other Name: Bar Sub-Assembly, Rear Stabilizer; Suspension Stabilizer Bar, Rear; Sway Bar
Position: Rear
Part Name Code: 48805
Item Weight: 5.10 Pounds
Item Dimensions: 41.6 x 9.2 x 3.5 inches
Condition: New
Fitment Type: Direct Replacement
SKU: 48805-AD020
Warranty: This genuine part is guaranteed by Toyota's
factory warranty.
More Info
Fits the following 2003 Toyota Tacoma Submodels:
Base, Pre Runner | 4 Cyl 2.4 L GAS, 4 Cyl 2.7 L GAS, 6 Cyl 3.4 L GAS
2003 Toyota Tacoma Sway Bar Kit
Looking for affordable OEM 2003 Toyota Tacoma Sway Bar Kit? Explore our comprehensive catalogue of genuine 2003 Toyota Tacoma Sway Bar Kit. All our parts are covered by the manufacturer's warranty. Plus, our straightforward return policy and speedy delivery service ensure an unparalleled shopping experience. We look forward to your visit!
2003 Toyota Tacoma Sway Bar Kit Parts Q&A
Q: How to service the Sway Bar Kit on 2003 Toyota Tacoma?
A: The service procedure for the sway bar kit of RZN191L-TRPDKAB, RZN196L-CRPDKAB, PZN196L-PRPDKAB, VZN195L-CRPDKAB, VZN195L-PRPDKAB starts by removing front wheels before applying 110 Nm (1,150 kgf-cm, 83 ft. lbs.) torque. Start by removing the sway bar links through the removal of 2 nuts and the link from the lower suspension arm and sway bar kit under a torque of 90 Nm (920 kgf-cm, 66 ft. lbs.). A hexagon wrench should be used to maintain ball joint stud stability when the nut causes its rotation. The same process needs to be performed on this other wheel side. The sway bar kit removal starts when you remove four bracket set bolts together with the bar, cushions, and brackets at a torque of 25 Nm (260 kgf-cm, 19 ft. lbs.). Remove the sway bar kit from its brackets and cushions by turning off the 2 connecting brackets with their associated cushions. During inspection of the link ball joint on the sway bar kit check its rotation by rotating the ball joint stud 5 times before installing the nut. To achieve correct turning torque between 0.05 - 2.0 Nm (0.5 - 20 kgf-cm, 0.4 - 17 inch lbs.), use a torque wrench to step the nut at one full turn every 2 - 4 seconds and get a reading at the fifth rotation. To finish the process operators execute installation based on the reverse sequence of disinstallation steps.