During the installation process of the 1GR-FE engine intake manifold sub-assembly begin by applying new gaskets to each cylinder head while ensuring port holes match up properly and the installation orientation is accurate. Position the intake manifold onto the cylinder heads and gradually tighten its 10 bolts to 26 Nm (265 kgf-cm, 19 ft-lbf) while completing several torque passes starting from the internal bolts towards the exterior bolts. The second step in this procedure demands the installation of the fuel delivery pipe sub-assembly. Add a new gasket to the intake air surge tank before tightening it using a 8-mm hexagon wrench to apply 4 bolts and 2 nuts to a torque of 28 Nm (286 kgf-cm, 21 ft-lbf). Secure the No. 2 surge tank stay together with No. 1 surge tank stay through 2 bolts each at 21 Nm (214 kgf-cm, 15 ft-lbf). The procedure requires attaching the single baffle plate bolt to 9.0 Nm torque while you also connect the wire harness clamp before adding throttle body bracket bolts at 21 Nm torque. You must attach the vacuum switching valve (for ACIS) connector with two wire harness clamps while correctly fitting the No. 1 ventilation hose and its union to check valve hose and purge VSV connector and purge line hose. The No. 4 and No. 5 water by-pass hoses should be connected with the
Throttle Position Sensor and throttle control motor connector. You need to install the air cleaner assembly with its element by tightening 2 bolts at 8.0 Nm (82 kgf-cm, 71 in-lbf) while also setting the hose clamp to maintain a protrusion of less than 0.5 mm (0.0197 in.) before connecting the MAF meter connector along with 2 wire harness clamps and the vacuum hose with tightened clamp. Safely insert the grommet pin for the No. 2 air cleaner hose and mount it with 2 bolts at 7.5 Nm (76 kgf-cm, 66 in-lbf). Tighten the hose clamp to 4.0 Nm (41 kgf-cm, 35 in-lbf). Reconnect the negative terminal cable of the battery while remembering any system which demands system initialization afterward. Engine coolant should be added while searching for both coolant and fuel leakage. After installing 2 V-bank cover nuts at 7.5 Nm (76 kgf-cm, 66 in-lbf), continue to put on 7 front cowl top outer panel bolts also at 7.5 Nm (76 kgf-cm, 66 in-lbf) before connecting both washer hoses. The final step entails putting on the front
Wiper Motor along with its link assembly and the Number 1 engine under cover.