The installation of the 6
Spark Plugs for the 2GR-FE engine requires placing them in position and tightening them to 18 Nm (183 kgf-cm, 13 ft-lbf). Use the 6 bolts to install the 6 ignition coils while torquing them at 10 Nm (102 kgf-cm, 7 ft-lbf) and then fit the 6 ignition coil connectors. First install the No. 1 surge tank stay with 21 Nm (214 kgf-cm, 15 ft-lbf) torque on its specified bolt. Then implement 2 bolts, 2 clamps and a nut secured with 8.3 Nm (84 kgf-cm, 73 in-lbf). The technician should install the intake air surge tank assembly followed by the air cleaner cap sub-assembly before adding engine coolant. After cable connection to the negative terminal check for engine coolant leakage during inspection. Begin by putting in place the V-bank cover sub-assembly followed by the cowl top panel sub-assembly outer front and finally the No. 1 cowl top to cowl brace inner. You must install the windshield
Wiper Motor along with its link assembly and then assemble the front wiper arm for LH and RH positions.