You must start installation of the 2AZ-FE charging system generator assembly by ensuring the
Crankshaft Position Sensor wire harness is fitted to the wire harness clamp bracket which passes through the timing chain cover's rib. Use two bolts for generator installation and apply torque according to specific bolt measurements: 21 Nm for the first and 52 Nm for the second. Proceed to install the wire harness clamp along with the wire harness clamp bracket by tightening a bolt to 8.4 Nm (85 kgf-cm, 74 in-lbf). The generator wire requires a nut with 9.8 Nm (100 kgf-cm, 7 ft-lbf) torque before attaching the terminal cap followed by generator connector affixment. The fan and generator V belt should be installed while finishing with connecting the cable to the negative battery terminal.