When installing the Air Fuel Ratio Sensor for Bank 1 Sensor 1, use Special Service Tool: 09224-00010 according to the necessary torque specification. Torque the sensor to 44 Nm (449 kgf-cm, 32 ft-lbf) with the tool or 40 Nm (408 kgf-cm, 30 ft-lbf) without the tool. The torque application must use a torque wrench that has a 30 cm (11.81 in.) fulcrum length. The wire harness clamp should be secured to the sensor while connecting the sensor connector. The converter installation requires connection of frame wire and No. 1 circuit breaker sensor while also connecting No. 6, No. 1, and No. 2 inverter cooling hoses. The installation procedure includes attaching the inverter cover followed by the front cowl top panel outer and windshield
Wiper Motor and link assembly combined with cowl top ventilator louvers (RH and LH) and hood to cowl top seal before adding the front wiper arms (LH and RH) with their respective cover while completing the process with rear No. 3 floor board and rear deck floor box and rear No. 2 floor board. The procedure requires attachment of the service plug grip followed by connecting the cable to the negative battery terminal then filling inverter coolant before investigating for leaks. After installing the engine under cover (RH and LH), the radiator support opening cover should be installed before performing initialization steps which require specific battery cable procedures when disconnecting and reconnecting the negative (-) terminal.