The first step to install a luggage speaker involves mounting the woofer box speaker assembly followed by installation of the roof side garnish assembly inner RH. Proceed with installing the deck trim side panel assembly RH before applying the rear door opening trim
Weather Strip RH. The next installation sequence should include the rear door scuff plate RH followed by the side trim box assembly RH and then the deck trim side board UPR RH. Then you must install the rear deck trim cover before putting on the RH deck floor box and finally the rear floor mat support plate. The last installation steps include the deck board assembly as well as the deck board sub-assembly and back door Weather Strip and tonneau cover retractor sub-assembly.