Other Name: Manifold Sub-Assembly, Exhaust; Exhaust Manifold, Right; Manifold Sub-Assembly, Exhaust, Passenger Side
Position: Passenger Side
Replaces: 17104-38010
Part Name Code: 17104
Item Weight: 12.80 Pounds
Item Dimensions: 18.0 x 11.7 x 8.2 inches
Condition: New
Fitment Type: Direct Replacement
SKU: 17104-38011
Warranty: This genuine part is guaranteed by Toyota's
factory warranty.
More Info
Fits the following 2009 Toyota Sequoia Submodels:
Limited, Nightshade, Platinum, SR5, TRD Pro, TRD Sport | 8 Cyl 5.7 L FLEX, 8 Cyl 5.7 L GAS
2009 Toyota Sequoia Exhaust Manifold
Looking for affordable OEM 2009 Toyota Sequoia Exhaust Manifold? Explore our comprehensive catalogue of genuine 2009 Toyota Sequoia Exhaust Manifold. All our parts are covered by the manufacturer's warranty. Plus, our straightforward return policy and speedy delivery service ensure an unparalleled shopping experience. We look forward to your visit!
2009 Toyota Sequoia Parts Questions & Experts Answers
Q: How to install the exhaust manifold and its associated components on 2009 Toyota Sequoia?
A: First apply a new gasket to the cylinder head with the "L" mark visible from the manifold side before installing it with exhaust manifold sub-assembly LH while evenly distributing torque to new nuts by multiple adjustments to reach 44 Nm (449 kgf-cm, 32 ft-lbf). Fitting the No. 2 exhaust manifold heat insulator requires 4 bolts to get uniformly tightened at 7.5 Nm (76 kgf-cm, 66 in-lbf). Drill Step by Step to Put Up No. 2 Steering Intermediate Shaft sub-assembly. Before installing the exhaust manifold sub-assembly RH, place a new gasket with "R" mark facing the manifold side onto the cylinder head and maintain temporary installation followed by a torque application sequence on eight new nuts to consistent specifications. Secure the No. 1 exhaust manifold heat insulator by fitting 4 bolts that need tightening to 7.5 Nm (76 kgf-cm, 66 in-lbf). After suitable installation of the front No. 2 exhaust pipe assembly install the front propeller shaft assembly (for 4WD) along with the propeller shaft heat insulator (for 4WD). Screw in the front exhaust pipe assembly followed by adding the air switching valve assembly (Bank 2) and No. 2 air tube (Bank 2) and then link the No. 2 air injection system hose. After connecting two water hoses to the transmission oil cooler you must install the water by-pass pipe assembly with three bolts torqued to 18 Nm (184 kgf-cm, 13 ft-lbf) and after that you must connect the No. 5 water by-pass hose using a clip and attach the heater outlet water hose. The first step requires installation of the engine oil level dipstick guide together with the air switching valve assembly for Bank 1 followed by the No. 3 air tube for Bank 1 and the No. 2 air hose for Bank 1. The procedure ends with the installation of air cleaner parts and air cleaner hoses before adding coolant then looking for any leakage. The technician must install the throttle body cover sub-assembly followed by the No. 1 engine under cover while conducting exhaust gas leak inspections. Secure both front fender apron seals LH and RH with their corresponding rear seals to their designated placement using proper fixes.