You must begin antenna cable installation by connecting the sub-assembly cable through four clamps then joining the connector. Begin by adding the instrument panel sub-assembly upper and then install both the front pillar garnish LH and RH. First install the glove compartment door assembly then follow with the instrument panel register assembly center before completing the installation of the radio receiver assembly with bracket (using Radio Receiver). Next, workers should install the No. 1 and No. 2 instrument cluster finish panel centers and the combination meter assembly before installing the instrument cluster finish panel sub-assembly. Finally, establish the cable connection to the negative terminal of the battery.