Installing the 2ZR-FE intake manifold begins with torquing the "TORX" socket E6 through 2 stud bolts until they reach 5.0 Nm (51 kgf-cm, 44 in-lbf). Install the bracket first using a bolt which should be tightened to 10 Nm (102 kgf-cm, 8 ft-lbf) while placing a new gasket inside the intake manifold. After placing the intake manifold alongside the intake manifold stay apply 4 bolts together with 2 nuts until the torque reaches 28 Nm (286 kgf-cm, 21 ft-lbf). The 3 hoses should be connected after users torque the wire harness bracket to 10 Nm (102 kgf-cm, 8 ft-lbf) using a bolt. The
Throttle Body assembly requires installation before moving to the air cleaner cap sub-assembly and then the No. 2 cylinder head cover. The fluid capacity should be checked before adding engine coolant while conducting a systematic leak inspection.