My Garage
Cart

OEM 2010 Scion xD Throttle Body

Fuel Injection Throttle Body
  • Select Vehicle by Model
  • Select Vehicle by VIN
Select Vehicle by Model
Make
Model
Year
or
Select Vehicle by VIN
For the most accurate results, select vehicle by your VIN (Vehicle Identification Number).

1 Throttle Body found

  • 2010 Scion xD Throttle Body - 22030-37020
    2010 Scion xD Throttle Body Diagram - 22030-37020
    View related parts

    2010 Scion xD Throttle Body

    Part Number: 22030-37020
    $321.76 MSRP: $459.41
    You Save: $137.65 (30%)
    Product Specifications
    • Other Name: Body Assembly, Throttle
    • Part Name Code: 22210
    • Item Weight: 2.70 Pounds
    • Item Dimensions: 8.6 x 7.5 x 5.7 inches
    • Condition: New
    • Fitment Type: Direct Replacement
    • SKU: 22030-37020
    • Warranty: This genuine part is guaranteed by Toyota's factory warranty.
    More Info
    Fits the following 2010 Scion xD Submodels:
    • Base | 4 Cyl 1.8 L GAS

2010 Scion xD Throttle Body

Looking for affordable OEM 2010 Scion xD Throttle Body? Explore our comprehensive catalogue of genuine 2010 Scion xD Throttle Body. All our parts are covered by the manufacturer's warranty. Plus, our straightforward return policy and speedy delivery service ensure an unparalleled shopping experience. We look forward to your visit!

2010 Scion xD Parts Questions & Experts Answers

  • Q: How to install the throttle body assembly on 2010 Scion xD?
    A: You must position a new gasket on top of the intake manifold when installing the throttle body assembly for the 2ZR-FE engine control system. Secure the throttle body assembly using 2 bolts along with 2 nuts by tightening them to 10 Nm (102 kgf-cm, 7 ft-lbf). Begin by attaching the water by-pass hose then the No. 2 water by-pass hose after which connect the throttle body assembly connector. Submit the air cleaner cap sub-assembly along with its hose and lock the two clamps into place before tightening the hose clamp to 3.0 Nm (31 kgf-cm, 27 in-lbf). The No. 2 ventilation hose and the wire harness clamp and mass air flow meter connector need to be connected. Engine coolant addition must occur before inspecting the vehicle for any possible coolant leakages. After all previous steps are complete you should install the No. 2 cylinder head cover.

Related 2010 Scion xD Parts