Following proper installation of the generator assembly attach it with 2 bolts conducted to a torque specification of 43 Nm (438 kgf-cm, 32 ft-lbf). Secure the generator wire with the generator connector by torquing the nut to reach 9.8 Nm (100 kgf-cm, 7 ft-lbf). The terminal cap gets installed afterward. Position the V belt of the fan and generator. Finish the installation by tightening the cable to the negative battery terminal at 3.9 Nm (40 kgf-cm and 35 in-lbf).